Here's a optimistic schedule of what we could accomplish Monday the 29th.
Mon 29
-Waterjet
-cut side plates and ball hitter arm out
-Lathe
-hex shaft sleeves for double gearbox
-tensioner bolts *least important on this day
-Mill
-ream holes in side plate for motor ball bearings
- use end mill for tensioner slots
-create second double gearbox pillow block(Nate already made one)
-mill 20deg angle into side plate mounts *only if we have extra time on
mill
-mill slot in angle for ramp velcro(note, measure velcro thickness
first)
-use mill to drill mounting holes in left side support for the ball
hitter arm
*note only if we have extra time left
-Drill Press
-drill holes for track wheels in side plates
-measure planetary gearbox longer and shorter segments, drill 4 holes in delrin plate
-Other
-think of solution for mounting casters(drill holes larger in acrylic?)
-assemble and test double gearbox with machine motion.
-have bob knurl top flipper drive shaft, so we don't have slipage